Construction glossary

Bearing capacity
The pressure the soil can safely carry, in kPa, which sizes the foundations.
Blinding
A thin layer of weak concrete under foundations to give a clean, level base.
BOQ (Bill of Quantities)
A priced list of every item of work in a project, grouped in sections, used to tender and control cost.
C of O (Certificate of Occupancy)
A Nigerian land title document granting the right to occupy land for a term of years.
Concrete grade
The specified strength of concrete, for example C25 = 25 N/mm² at 28 days.
Contingency
A sum set aside for unforeseen work, usually a percentage of the construction cost.
Critical path
The longest chain of dependent tasks; any delay on it delays completion.
Dead load
The permanent weight of the structure itself and fixed finishes.
DPC (Damp-proof course)
A barrier laid in walls near ground level to stop rising damp.
Earned value
The budgeted cost of the work actually completed, used to track progress against cost.
Finish-to-start (FS)
A dependency where the next task can only begin when the previous one finishes.
Float
How long a task can slip without delaying the project end date.
Formwork
Temporary moulds that hold wet concrete until it sets.
Hardcore
Compacted broken stone or rubble laid under a ground floor slab.
Imposed (live) load
Load from people, furniture and use, which can change over time.
Lead time
The time between placing an order and delivery to site.
Lintel
A beam over a door or window opening that carries the wall above.
Preliminaries
Site-wide costs not tied to one item: site setup, supervision, insurance, temporary works.
Prime cost (PC) sum
An allowance for items to be bought from a named supplier, such as sanitary fittings.
Provisional sum
An allowance for work that cannot yet be fully described or priced.
Rate build-up
The breakdown of a unit rate into material, labour and plant costs plus allowances.
Retention
A percentage of each payment held back until defects are fixed.
RFQ (Request for quotation)
An invitation to suppliers to price specific items.
Snag
A minor defect noted near completion that must be put right.
Takeoff
Measuring quantities from drawings or a building model.
Valuation
A periodic measurement of work done, used to certify interim payments.
Variation
A change to the agreed scope of work, priced and approved separately.
Waste factor
Extra percentage added to quantities to cover cutting, breakage and loss on site.